Australia markets open in 8 hours 7 minutes

Tokyo Electric Power Co Holdings (TPO.MU)

Munich - Munich Delayed price. Currency in EUR
Add to watchlist
4.7600+0.0050 (+0.11%)
As of 08:00AM CET. Market open.
Full screen
Previous close4.7550
Open4.7600
Bid4.7570 x 0
Ask4.8960 x 0
Day's range4.7600 - 4.7600
52-week range3.0150 - 5.5720
Volume1,000
Avg. volume0
Market capN/A
Beta (5Y monthly)N/A
PE ratio (TTM)N/A
EPS (TTM)N/A
Earnings dateN/A
Forward dividend & yieldN/A (N/A)
Ex-dividend dateN/A
1y target estN/A
  • Associated Press Finance

    First drone probe of melted fuel inside Fukushima Daiichi reactor halted due to equipment glitch

    Japanese authorities said they were forced to abandon plans Thursday to send in drones for a second day to probe one of the damaged reactors at the Fukushima Daiichi nuclear power plant because of equipment failure. Two drones successfully flew inside the reactor for the first time on Wednesday, to examine some of the molten fuel debris and other damages in areas where earlier robots failed to reach. The government and TEPCO plan to remove the massive amount of fatally radioactive melted nuclear fuel that remains inside each reactor since a magnitude 9.0 quake and tsunami in March 2011 destroyed the plant’s power supply and cooling systems, causing a triple meltdown.

  • Associated Press Finance

    A small drone flies into a damaged Fukushima nuclear reactor for the first time to study melted fuel

    A drone small enough to fit in one's hand flew inside one of the damaged reactors at Japan's Fukushima Daiichi nuclear power plant Wednesday in hopes it can examine some of the molten fuel debris in areas where earlier robots failed to reach. Tokyo Electric Power Company Holdings also began releasing the fourth batch of the plant’s treated and diluted radioactive wastewater into the sea Wednesday. The government and TEPCO, the plant's operator, say the water is safe and the process is being monitored by the International Atomic Energy Agency, but the discharges have faced strong opposition by fishing groups and a Chinese ban on Japanese seafood.

  • Associated Press Finance

    Japan's industry minister chides utility president over radioactive water leak at Fukushima plant

    Japan’s industry minister summoned the president of the utility that runs the Fukushima nuclear power plant to his office Wednesday and chided him for a radioactive water leak at the plant earlier this month. Mishaps related to the massive amount of contaminated water at the tsunami-damaged Fukushima Daiichi plant are especially sensitive while the government tries to get support for discharging treated wastewater into the sea — a process that will take decades and has worried people inside and outside Japan. Industry Minister Ken Saito called for heightened safety awareness and preventive measures and urged company President Tomoaki Kobayakawa to take it seriously as a management issue.