Australia markets open in 33 minutes

Probe Gold Inc. (PROBF)

OTC Markets OTCPK - OTC Markets OTCPK Delayed price. Currency in USD
Add to watchlist
1.0000+0.0107 (+1.08%)
At close: 03:55PM EDT
Full screen
Trade prices are not sourced from all markets
Previous close0.9893
Open1.0000
Bid0.0000 x 0
Ask0.0000 x 0
Day's range0.9899 - 1.0090
52-week range0.8890 - 1.2800
Volume46,700
Avg. volume42,519
Market cap170.966M
Beta (5Y monthly)N/A
PE ratio (TTM)N/A
EPS (TTM)N/A
Earnings dateN/A
Forward dividend & yieldN/A (N/A)
Ex-dividend dateN/A
1y target estN/A
  • GlobeNewswire

    Probe Gold Intersects Thick Gold Zones in Expansion Drilling along the Courvan Trend, Intervals of up to 133 Metres grading 1.1 g/t Au, Novador Project, Quebec

    Highlights: New, near-surface intercepts at Courvan, grading up 1.1 g/t Au over 133.0 metres; 3.2 g/t Au over 19.0 metres; and 0.8 g/t Au over 54.0 metres.Near-surface, infill drilling at Courvan intersected gold zones grading up 1.7 g/t Au over 17.0 metres; and 0.8 g/t Au over 37.5m.10,000 metres exploration drill program is commencing next week, with two drill rigs, at Novador, targeting new areas.Large regional prospecting and soil geochemical surveys are ongoing on the Val-d’Or properties. T

  • GlobeNewswire

    Probe Gold Advances Environmental Permitting for Novador Project: Submits Detailed Project Description

    Highlights: Probe Gold has submitted the Detailed Project Description (“DPD”) for the Novador project to the Impact Assessment Agency of Canada ("IAAC"), marking a significant advancement in the federal environmental permitting process.This submission follows the Initial Project Description (“IPD”) sent to the IAAC in October 2023. TORONTO, May 15, 2024 (GLOBE NEWSWIRE) -- PROBE GOLD INC. (TSX: PRB) (OTCQB: PROBF) (“Probe” or the “Company”) is pleased to announce the official submission of the D

  • GlobeNewswire

    Probe Gold intersects 23.1 g/t Au over 3.1 metres in infill drilling at the Monique deposit, Novador Project, Quebec

    Highlights: New multiple high-grade gold intercepts in both expansion and infill drilling. Expansion drilling within and around the Monique conceptual pit intersected significant intervals of mineralization grading up to 4.3 g/t Au over 16.0 metres; 4.2 g/t Au over 14.7 metres and 1.8 g/t Au over 34.0 metres.Infill drilling continues to confirm gold zones inside and just under the conceptual pit, yielding up to 23.1 g/t Au over 3.1 metres; 8.3 g/t Au over 4.0 metres; and 1.5 g/t Au over 20.0 met