Advertisement
Australia markets close in 1 hour 11 minutes
  • ALL ORDS

    7,894.00
    +44.60 (+0.57%)
     
  • ASX 200

    7,624.80
    +37.80 (+0.50%)
     
  • AUD/USD

    0.6575
    +0.0004 (+0.06%)
     
  • OIL

    79.14
    +0.19 (+0.24%)
     
  • GOLD

    2,316.20
    +6.60 (+0.29%)
     
  • Bitcoin AUD

    90,676.27
    +3,452.95 (+3.96%)
     
  • CMC Crypto 200

    1,282.90
    +12.15 (+0.96%)
     
  • AUD/EUR

    0.6123
    +0.0004 (+0.06%)
     
  • AUD/NZD

    1.1014
    +0.0005 (+0.04%)
     
  • NZX 50

    11,913.29
    +39.25 (+0.33%)
     
  • NASDAQ

    17,541.54
    +222.99 (+1.29%)
     
  • FTSE

    8,172.15
    +50.91 (+0.63%)
     
  • Dow Jones

    38,225.66
    +322.37 (+0.85%)
     
  • DAX

    17,896.50
    -35.67 (-0.20%)
     
  • Hang Seng

    18,413.79
    +206.66 (+1.14%)
     
  • NIKKEI 225

    38,236.07
    -37.98 (-0.10%)
     

Auriant Mining AB (publ.) publishes 12m 2023 operational update

Auriant Mining AB
Auriant Mining AB

Highlights:

  • In 12m 2023, hard rock gold production amounted to 648.3 kg (20,844 oz), compared with 771.5 kg (24,805 oz) in 12m 2022, a decrease of 16%, or 123.2 kg (3,961 oz);

  • Alluvial gold production by a third party mining contractor at Staroverinskaya amounted to 20.0 kg (642 oz), compared with 8.6 kg (278 oz) an increase of 131%, or 11.3 kg (364 oz).

  • In 12m 2023, total gold sales were 603.9 kg (19,415 oz), compared with 882.2 kg (28,364 oz) in 12m 2022, a decrease of 278.4 kg (8,949 oz), or 32%;

  • 416,986 tonnes of ore with average grade of 1.75 g/t were processed through the CIL plant compared with 413,323 tonnes in 12m 2022, an increase of 1%, or 3,663 tonnes

  • The average grade during 12m 2023 was 1.75 g/t, compared to 2.04 g/t in 12m 2022, a decrease of 14%;

  • 235,670 tonnes of ore were mined in 12m 2023, compared with 355,310 tonnes in 12m 2022, a decrease of 119,640 tonnes or 34%. Stripping volume amounted to 2,190,900 m3 (-5,400 m3, or 0.2% less than in 12m 2022);

The Company predicted 630 – 670 kg of gold produced in 2023 with the actual gold production at 668.3 kg.  The Company’s targets were fulfilled.

ADVERTISEMENT

 Total Gold Production

Production unit

 12m 2023

 12m 2022

 Change

 

 kg

 oz

 kg

 oz

 kg

 oz

 %

 Hard rock

 

 

 

 

 

 

 

 Tardan (CIL)

648,3

20 844

771,5

24 805

-123,2

-             3 961

-16%

 Alluvial

 

 

 

 

 

 

 

 Staroverinskaya

20,0

642

8,6

278

11,3

364

131%

 Total gold produced

668,3

21 486

780,2

25 082

-111,9

-             3 597

-14%


Hard Rock Gold Production

 

 Unit

 12m 2023

 12m 2022

 Change

 Mining

 

 

 

 

 

Waste stripping

000 m3

2 190,9

2 196,3

-              5,4

0,2%

Ore mined

000 tonnes

235,7

355,3

-           119,6

-34%

Gold in Ore

kg

430,3

681,4

-          251,2

-37%

Average grade

g/t

2,33

1,92

0,41

21%

 CIL

 

 

 

 

 

Ore processing

000 tonnes

417,0

413,3

3,7

1%

Grade

g/t

1,75

2,04

-            0,29

-14%

Gold in ore processing

kg

728,3

842,8

-          114,5

-14%

Gold produced CIL

kg

648,3

771,5

-          123,2

-16%

Recovery

%

89,0%

92%

-2,5%

-2,8%

 Warehouse on Dec 31

 

 

 

 

 

Ore

000 tonnes

63,7

88,9

-            25,2

-28%

Grade

g/t

1,66

1,59

0,07

5%

For more information, please contact:

Danilo Lange, CEO
Tel: +7 495 109 02 82
E-mail: d.lange@auriant.com

Company name: Auriant Mining AB Short name: AUR
ISIN-code: SE0001337213

Website: www.auriant.com

 

 

Auriant Mining AB (AUR) is a Swedish junior mining company focused on gold exploration and production in Russia, primarily in the Republic of Tyva, Zabaikalye and the Republic of Khakassia. The company has currently four assets, including two operating mines (Tardan and Alluvial at Staroverinskaya), one early stage exploration asset and one development asset.

Since July 19, 2010, Auriant Mining´s shares are traded on Nasdaq First North Premier Growth Market under the short name AUR. For more information, please visit www.auriant.com. G&W Fondkommission is Certified Adviser to Auriant, for more information please visit www.gwkapital.se.

This information is information that Auriant Mining AB is obliged to make public pursuant to the EU Market Abuse Regulation. The information was submitted for publication, through the agency of the contact persons set out above, at 10.20 CET on January 19th, 2024.

Attachment