Previous close | 1.3300 |
Open | 1.3350 |
Bid | 1.4100 x 3010200 |
Ask | 1.3200 x 3134600 |
Day's range | 1.3100 - 1.3450 |
52-week range | 1.0525 - 1.6850 |
Volume | |
Avg. volume | 4,512,301 |
Market cap | 2.434B |
Beta (5Y monthly) | -0.78 |
PE ratio (TTM) | N/A |
EPS (TTM) | N/A |
Earnings date | N/A |
Forward dividend & yield | N/A (N/A) |
Ex-dividend date | N/A |
1y target est | N/A |
Figure 1 Location of Novo tenements, the Egina JV area and priority projects in the Pilbara Figure 2 Cross section at Lowe showing interpreted geology with recent intercepts Figure 3 Heckmair Prospect – aeromagnetic/gravity images with bottom of hole lead anomalism in AC drilling Figure 4 Heckmair cross section (619120E) HIGHLIGHTS More than 10,500 m of combined aircore (AC) and reverse circulation (RC) drilling completed by De Grey Mining (ASX: DEG) at the Becher Project in Q4 2023, as part of
RC Drilling Commenced at Becher Figure 1 Novo’s Pilbara tenure showing priority prospects, joint venture interests and the location of drilling at Nunyerry North and Becher. Figure 2 Nunyerry North coarse gold in white translucent quartz veins from surface. Figure 3 Nunyerry North geological interpretation and drill hole location plan. Figure 4 Nunyerry North long section (looking NNW) showing m x g/t Au (downhole width) for the Main Lode #1 Figure 5 Nunyerry North cross sections 590860E looking
Figure 1: RC drilling underway at Nunyerry North. Figure 1: RC drilling underway at Nunyerry North. Figure 2: Novo’s Pilbara tenure, showing priority prospects and joint venture interests. Figure 2: Novo’s Pilbara tenure, showing priority prospects and joint venture interests. Figure 3: Egina Gold Camp tenure showing key areas of focus and joint venture interests. Figure 3: Egina Gold Camp tenure showing key areas of focus and joint venture interests. Figure 4: Contoured gold results from soil s