Previous close | 0.0580 |
Open | 0.0570 |
Bid | 0.0590 x 0 |
Ask | 0.0600 x 0 |
Day's range | 0.0570 - 0.0620 |
52-week range | 0.0370 - 0.1200 |
Volume | |
Avg. volume | 1,946,604 |
Market cap | 101.245M |
Beta (5Y monthly) | 0.29 |
PE ratio (TTM) | N/A |
EPS (TTM) | -0.0000 |
Earnings date | 25 Mar 2024 - 26 Mar 2024 |
Forward dividend & yield | N/A (N/A) |
Ex-dividend date | N/A |
1y target est | N/A |
TORONTO, March 27, 2024 (GLOBE NEWSWIRE) -- Xanadu Mines Ltd (ASX: XAM, TSX: XAM) (“Xanadu” or “the Company”) is pleased to advise that in accordance with ASX Listing Rule 3.13.1, Xanadu will hold its 2024 Annual General Meeting on: Date: Thursday, 23 May 2024Time: 11:00am AESTLocation: Victoria Hotel 215 Little Collins Street Melbourne Victoria 3000 Australia The closing date for the receipt of nominations from persons wishing to be considered for election as a director is Wednesday, 3 April 20
Figure 1 Map of Mongolia, showing location of the Red Mountain Mining Lease. Figure 2 The Red Mountain Mining Lease with designed drill holes and target locations. Figure 3 Exploration drilling has commenced at Red Mountain. Figure 4 Target 33 showing previous drilling and trenching(2) and planned drilling 2024. Figure 5 Target 10 showing previous drilling and planned drilling 2024(4). Figure 6 Target 10 showing previous drilling and planned drilling 2024(6). TORONTO, March 27, 2024 (GLOBE NEWSW
Figure 1 PFS Water Drilling in ZUK Basin Figure 2 Drilling Water Monitoring Hole at ZUK Basin TORONTO, March 27, 2024 (GLOBE NEWSWIRE) -- Xanadu Mines Ltd (ASX: XAM, TSX: XAM) (Xanadu, XAM or the Company) is pleased to announce that the hydrological drilling program has re-commenced for the Kharmagtai Pre-Feasibility Study (PFS), which is being developed with the Company’s joint venture partner Zijin Mining Group Co., Ltd. (Zijin). Water supply is a core input to the study; a key driver to maxim